PROJECT

Pre-wafer process plant-crystal column polishing [line edge warehouse]

A wafer factory, pre-process crystal column grinding [line edge warehouse]
 
Status before import:
1. The storage method uses traditional shelves, scattered around the workshop.
2. Reclaiming is time-consuming and difficult to find.
3. Human-made material picking errors cause serious losses due to processing errors.
4. The traditional shelf occupies a large area, which leads to the low utilization rate of the plant.
5. The traditional shelf is an open space, and the materials cannot be controlled.
6. Unable to grasp the actual quantity, and the accounts do not match.
 
Status after import:
1. The evaluation uses 4 medium-sized 4m smart/automatic storage, which can centrally manage all the crystal pillars on site.
2. Automated reclaiming increases efficiency.
3. Significantly reduce the possibility of reclaiming errors.
4. The material limit is stored up to greatly reduce the floor space.
5. Closed storage plus authority management equals 100% controlled materials.
6. "Real-time update of warehouse material information" reduces the non-conformity of accounting materials.
 
 
Apex Equipment CO., LTD.
TEL:04-23845678
FAX:04-23863079
ADD:No. 5-17, Wenshan N. Ln., Nantun Dist., Taichung City 408019 , Taiwan (R.O.C.)
Email:ste@jyste.tw
銓量科技有限公司 
統編 60233881
鈞曜科技有限公司
統編 42876046
 
TOP